PGE Elektrownia Bełchatów
Modernization and renovation of the main steam and water pipelines – blocks no. 7-12 in PGE Bełchatów Power Plant.
Client
PGE El. Bełchatów /Polimex-Mostostal SA
Tones
2600
Realization period
2011-2016
Modernization and renovation of the main steam and water pipelines – blocks no. 7-12 in PGE Bełchatów Power Plant.
Client
PGE El. Bełchatów /Polimex-Mostostal SA
Tones
2600
Realization period
2011-2016